¡Envío gratis y en 1 día!* a Península + 5% dcto  ¡Ver más!

menú

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Repair and rehabilitation of a cable stayed bridge: Case study of a bridge across the Chambal River (Kota) (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
104
Encuadernación
Tapa Blanda
Dimensiones
21.0 x 14.8 x 0.6 cm
Peso
0.15 kg.
ISBN13
9783668925595
Categorías

Repair and rehabilitation of a cable stayed bridge: Case study of a bridge across the Chambal River (Kota) (en Inglés)

Rajshree Charan (Autor) · Grin Verlag · Tapa Blanda

Repair and rehabilitation of a cable stayed bridge: Case study of a bridge across the Chambal River (Kota) (en Inglés) - Charan, Rajshree

Libro Físico

77,58 €

81,66 €

Ahorras: 4,08 €

5% descuento
  • Estado: Nuevo
  • Quedan 77 unidades
Origen: Estados Unidos (Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el Miércoles 19 de Junio y el Lunes 08 de Julio.
Lo recibirás en cualquier lugar de España entre 1 y 5 días hábiles luego del envío.

Reseña del libro "Repair and rehabilitation of a cable stayed bridge: Case study of a bridge across the Chambal River (Kota) (en Inglés)"

Master's Thesis from the year 2011 in the subject Engineering - Civil Engineering, grade: 10, language: English, abstract: In the present study, the failure of cable stayed bridge across Chambal River (Kota) will be discussed. The causes of its collapse and detail study of the cable stayed bridge cross Chambal River will be done. The static and dynamic modeling of cable stayed bridge is also done. At the end, the measure to repair and rehabilitation cable stayed is discussed. Cable stayed bridge has become one of the most frequently used bridge system throughout the world because of their aesthetic appeal, structural efficiency, enhanced stiffness compared with suspension bridge, ease of construction and small size of substructure. Over past 40 years, rapid developments have been made on modern cable stayed bridge. With main span length increasing, more shallow and slender stiffness girders used in modern cable stayed bridge, the safety of whole bridge under service loading and environmental dynamic loading such as impact, wind and earthquake loadings, presents increasingly important concern in design, construction and service In India the first cable stayed bridge was AKKAR BRIDGE, SIKKIM (1985) Constructed by Gammon India limited. The other cable stayed bridge are Vidhya sagar Setu (1992) Kolkata, Bandra - worli sea link (Mumbai), Cable stayed bridge across Chambal river (Kota) etc.

Opiniones del libro

Ver más opiniones de clientes
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes